Few List of Projects Completed by Us
Drone Survey at Chennai Municipal Dumping Yard
During- July 2023
Towards establishing GCP at the land parcel of 500 acres,
flying the survey-grade drone and collection of the data
1. Autocad Topographic drawing in DWG format which show the main physical features on the ground, such as buildings, waste spread area, fences, roads
2. Autocad Contour plan in DWG format
3. DTM, DSM should be in .img / .tiff format.
4. Final GIS Layers (Thematic) in .shp/GDB with data model as per NUIS standards
5. High Resolution Ortho mosaics in .img/.tiff format and Raw images
6. Processing Report and Flight details
7. 3D point cloud: Derived data calculated by matching several photographs to correspond it to a surface point on the surveyed object
8. HD Aerial video of the AOI
9. A0 Map in 1:500 scale of the AOI with all the features captured displayed with standard symbology.
10. Geotagged photographs; High resolution Orthomosiac: A photogrammetrically geo rectified and digitally stitched mosaic of site images
Giridih, Jharkhand Road Project
During- June 2023
Preparation of Detailed project report for construction of Two Lane/Two Lane with Paved Shoulder road for Giridih bypass (towards Tundi) road, including replacement of culverts and bridges, construction of new culverts and bridges, complete Land Acquisition Plan including ownership details all complete as per the latest guidelines, Resettlement and Rehabilitation Plan, and Forest Diversion Proposal, etc as required, at Giridih in the state of Jharkhand
Road Topography Survey at Bina, Madhya Pradesh
During- November 2022 to December 2022 (103Kms)
Topographical Survey for “Rehabilitation & Upgradation of Kurwai–Mungaoli–Chanderi Road section of NH-346, from Design Chainage 0.000 to 81.300 Km (Total length 81.3km) to Two lane with paved shoulder configuration along with One time improvement in 07 nos. of bypassed built-up areas in a total length of 21.985 km in the state of Madhya Pradesh on EPC mode.
New Alignment Road Survey 30KM at Sikkim
During– November 2020 to January 2021
Detailed topography survey of new alignment road between Rongli to Chhanggu Km00+000 to 30+000 through DGPS and Total Station including formation work, permanent works & surfacing works in the area of responsibility of project in the state of Sikkim
Proposed Road Survey at Arunachal Pradesh
During– July, 2021
Detailed topography survey of road as part of ICBR works from Survasamba to Kanankspur between chainage KM 00 to KM 6.550 through EPC Mode of execution to include formation works, permanent works & surfacing works in area of responsibility of project Vartak in the state of Arunachal Pradesh.
Road center line layout Survey using DGPS at Assam
During– July 2021
Setting out Design Center the line on the ground @ 25-meter intervals in presence of PWD Authority to on Nails and cross-sections at 25m intervals on straight portion and 15m intervals at curves including traverse at Dirakgate on NH-52 To Penegree – Margheritha- 54Km and Moran To Nagajan 13Km
Road center line layout Survey using DGPS & Total Station at Assam
During– September 2021
Setting out Design Center the line on the ground @ 25-meter intervals in presence of PWD Authority to on Nails and cross-sections at 50m intervals on straight portion and 25m intervals at curves including traverse at Moran Naharkatiya Road (Desang kinar bengali to Kathalguri)- 24Km
DGPS Layout Survey at NH-301, Jammu and Kashmir